Centre national de crise à Senningen

Maître d'ouvrage
Administration des Bâtiments Publics
Architecte
Arco, Luxembourg
lieu d'exécution
Senningen
Réalisation
2021
Surface totale
1.969 m2

Installations covered by our engineering team

  • Heating installations
  • Ventilation installations
  • Air conditioning installations
  • Sanitary installations
  • Fire protection installations
  • Low-voltage electrical installations
  • Medium-voltage electrical installations
  • Extra-low-voltage electrical installations
  • High-voltage electrical installations
  • Emergency power supply installations
  • Fire detection and monitoring systems
  • Automatic extinguishing systems ("Argonite")
  • Elevator installations
  • Access control systems
  • Video surveillance systems
  • Intrusion detection systems

Our Services

  • General design of technical installations
  • Preliminary design
  • Final project design
  • Preparation of the operating permit application (commodo/incommodo)
  • Preparation of tender documents, analysis of offers, and award proposals
  • Quality control of work execution on site
  • Acceptance of installations
  • Invoice and final account verification
Plus de détails