Campus scolaire à Echternach

Maître d'ouvrage
Administration Communale d’Echternach
Architecte
WW+, Esch-sur-Alzette
lieu d'exécution
Echternach
Réalisation
2023
Surface totale
9.299 m2

Specific features

DGNB Gold-certified building, project carried out with a timber structure; the material is highlighted both inside and outside, on the façade.

Installations covered by our engineering team

  • Heating systems
  • Ventilation systems
  • Air conditioning systems
  • Sanitary installations
  • Fire protection systems
  • Medium-voltage installations
  • Low-current electrical installations
  • High-current electrical installations
  • Emergency power systems
  • Lighting systems
  • Emergency lighting systems
  • Fire detection and monitoring systems
  • Elevator systems
Plus de détails