Ecole Cycle 1 à Contern
- Maître d'ouvrage
- Administration Communale de Contern
- Architecte
-
M3 Architectes S.A., Luxembourg
Incopa, Saarbrücken - Ingénieur en génie-civil
- B.E.S.T. Ingénieurs-Conseils
- Réalisation
- 2016
- Surface totale
- 4.900 m²
General data
Studies: | 2010-2014 |
Commissioning: | Sept. 2016 |
Total investment (excl. VAT): | 8,900,000 € |
Technical investment (excl. VAT): | 1,160,000 € |
Built volume: | 22,000 m³ |
Surface area: | 4,900 m² |
Equipment processed by our office
- Heating installations
- Ventilation and air extraction systems
- Sanitary installations
- Low voltage electrical installations
- Low current electrical installations
- High current electrical installations
- Electrical installations for emergency power
- Lighting installations
- Control and monitoring installations ???
- Lift installations
- Kitchen facilities
Our services
- General design of technical installations
- Preliminary design
- Final project
- Preparation of the operating permit application (commodo/incommodo)
- Preparation of tender documents, analysis of bids, award proposals
- Quality control of the work on site
- Acceptance of the installations
- Checking invoices and accounts
Contact us
Our team is at your disposal for any request for information.