Ecole Cycle 1 à Contern

Maître d'ouvrage
Administration Communale de Contern
Architecte
M3 Architectes S.A., Luxembourg
Incopa, Saarbrücken
Ingénieur en génie-civil
B.E.S.T. Ingénieurs-Conseils
Réalisation
2016
Surface totale
4.900 m²

General data

Studies: 2010-2014
Commissioning: Sept. 2016
Total investment (excl. VAT): 8,900,000 €
Technical investment (excl. VAT): 1,160,000 €
Built volume: 22,000 m³
Surface area: 4,900 m²

Equipment processed by our office

  • Heating installations
  • Ventilation and air extraction systems
  • Sanitary installations
  • Low voltage electrical installations
  • Low current electrical installations
  • High current electrical installations
  • Electrical installations for emergency power
  • Lighting installations
  • Control and monitoring installations ???
  • Lift installations
  • Kitchen facilities

Our services

  • General design of technical installations
  • Preliminary design
  • Final project
  • Preparation of the operating permit application (commodo/incommodo)
  • Preparation of tender documents, analysis of bids, award proposals
  • Quality control of the work on site
  • Acceptance of the installations
  • Checking invoices and accounts